Project Scope:
Design, manufacture, supply, install and commissioning of a Tamar Three Jet Turgo Impulse Turbine, complete with electrical and control system. The hydraulic system, inlet and upstream valves were also included. Generator 3772 kVA, Vertical Synchronous, 11kV.
|