Project Scope:
Design, manufacture, supply, install and commissioning of a Francis turbine, complete with electrical and control system. The inlet and bypass valves, and hydraulic system were also included. Generator 1100kW, Vertical Induction 11kV.
HOME | ABOUT US | PRODUCTS & SERVICES | PROJECTS | CONTACT USInternational Links | Disclaimer | Privacy & Collection
Tyco Flow Control Pacific is part of the Tyco International Ltd group.By accessing or using this website, you agree to the Terms of Use of Tyco Flow Control Pacific. ©2005-2010 Tyco Flow Control Pacific Pty. Ltd. ABN 83 000 922 690 . All Rights Reserved