Mangatawhiri

Size:230kW
Type:Francis
Location:New Zealand
Date:Completed August 2005

Project Scope:

Design, supply and commissioning of one 230kW francis turbine, direct coupled to a synchronous generator, complete with hydraulic system and electrical switchboard.  The project utilizes excess energy  available within the New Zealand water supply system, supplying electricity back into the local grid.  The turbine were design by Orengine and manufactured by Tyco Tamar, along with the hydraulic system and the electrical switchboard.  Installation and control system carried out by Tyco Services in New Zealand.